• 304 Stainless Steel Gold Color Kitchen Taps
  • 304 Stainless Steel Gold Color Kitchen Taps
  • 304 Stainless Steel Gold Color Kitchen Taps
  • video

304 Stainless Steel Gold Color Kitchen Taps

  • KF149
  • 452 X28 MM
  • China
  • 304 SUS
  • Topmount
  • CUPC
  • $40
Kitchen faucet with pull down sprayer, 3-function spray head: includes ring, boost, and sweep spray technologies. Easy install: hose and spray head pre-installed. Comes with flexible supply lines for easy water hook-up. Lasting finish: our premium corrosion and tarnish resistant finishes are made to last.

Product Specification

304 SS faucet

Model: KF149

Brand:OEM/ODM

Exterior dimensions: 452 X28 MM

Certification: CUPC

Surface treatment: Brushed

Application:Kitchen/bathroom/ outdoors

Accessories:( Optional)

Color:stainless steel/gold/rose gold/matte black

Warranty: 5-10 years

Packing QTY: 1 PCS/CTN


Other Accessories

304 SS faucet

sink faucet


Production Process

304 SS faucet

304 SS faucetsink faucet


Packaging & Delivery & Payment

304 SS faucet

1. Package detail:Pallet package,Single carton,Honeycomb box(support customized packaging)

2. Delivery time: 10-15 days for sample; 35-45 days for whole 40 HQ

3. Shipment:By sea(Fob SHENZHEN),By air,express.

4. Payment terms: T/T 30% deposit in advance,the balance 70%.

304 SS faucet


sink faucet

What is the thickness of your sink?

For handmade sink,the thickness is from 1.2mm(304 SS) to 1.5mm(304 SS).ln addition to the APRON series is 1.5mm stainless,other series if you do not specify the thickness,we will use 1.2mm stainless steel plate(304SS-18gauge).


lf l don’t like your design,can you produce according to our design?

Yes,We can manufacture according to customers design.Please send your detailed requirement to our professional sales.


Can i get a sample?

Please consult our sales first.For some certain model,we can provide sample.However,you should be responsible for the transportation freight.


Can l visit factory? Can your factory arrange transportation for me?

Welcome,it is a great honor to invite you to visit factory. From Guangzhou city to our factory only takes half and one hour,we can arrange our driver to pick you up from your hotel when you arrived in Guangzhou City or Foshan City.


What is your terms of payment?

T/T 30% as deposit, and 70% before delivery


What about your delivery time?

30 days for a 20GP,45 days for a 40 HQ


What is the minimum order quantity?

5-10 pcs at lease.


Get the latest price? We will reply as soon as possible (within 12 hours)