• Sink Strainer With Tube Upc Kitchen Sink Plastic Strainer
  • Sink Strainer With Tube Upc Kitchen Sink Plastic Strainer
  • video

Sink Strainer With Tube Upc Kitchen Sink Plastic Strainer

  • THCD114
  • 12" X 21" mm
  • China
  • SUS 304
  • Drop in
  • IAPMO CUPC
  • $3.5
TOPHOME offers a variety of accessories for your sinks, including bottom grid, strainer, strainer cover,colander, drying rack,plate basket and cutting board ect. These sink kits create a cohesive look in your kitchen design. The accessories facilitate your kitchen life and make you enjoy your time in the kitchen.

Product Specification

sink sets

Model: THCD114

Brand:OEM/ODM

Exterior dimensions: 12" X 21"mm

Material: 304 SS

Surface treatment: Brushed

Application: Kitchen/bathroom/ outdoors

Accessories: ( Optional)

Color: stainless steel/gold/rose gold/matte black

Warranty: 5-10 years

Packing QTY: 1 PCS/CTN


Other Accessories

sink sets

sink drainer


Production Process

sink sets

Plastic Strainersink drainer


Packaging & Delivery & Payment

sink sets

1. Package detail:Pallet package,Single carton,Honeycomb box(support customized packaging)

2. Delivery time: 10-15 days for sample; 35-45 days for whole 40 HQ

3. Shipment:By sea(Fob SHENZHEN),By air,express.

4. Payment terms: T/T 30% deposit in advance,the balance 70%.

Plastic Strainer


sink drainer

What is the thickness of your sink?

For handmade sink,the thickness is from 1.2mm(304 SS) to 1.5mm(304 SS).ln addition to the APRON series is 1.5mm stainless,other series if you do not specify the thickness,we will use 1.2mm stainless steel plate(304SS-18gauge).


lf l don’t like your design,can you produce according to our design?

Yes,We can manufacture according to customers design.Please send your detailed requirement to our professional sales.


Can i get a sample?

Please consult our sales first.For some certain model,we can provide sample.However,you should be responsible for the transportation freight.


Can l visit factory? Can your factory arrange transportation for me?

Welcome,it is a great honor to invite you to visit factory. From Guangzhou city to our factory only takes half and one hour,we can arrange our driver to pick you up from your hotel when you arrived in Guangzhou City or Foshan City.


What is your terms of payment?

T/T 30% as deposit, and 70% before delivery


What about your delivery time?

30 days for a 20GP,45 days for a 40 HQ


What is the minimum order quantity?

5-10 pcs at lease.


Get the latest price? We will reply as soon as possible (within 12 hours)